The Management Plan for Construction and Ongoing Presence of the Ocean Outlet Pipeline, provides details on the predicted environmental impacts, monitoring program and management procedures to be implemented during construction of the Alkimos ocean outlet. It also outlines how these measures and monitoring program will be implemented by the Alkimos Water Alliance.
The Management Plan for Construction and Ongoing Presence of the Ocean Outlet Pipeline has been prepared to satisfy Condition 8-1 and Condition 9-1 as specified in Ministerial Statement 755 (November, 2007).
| Management Plan Cover and Table of Contents | |
| Section 1. Introduction | |
| Section 2. Scope and Framework | |
| Section 3. Data Acquisition (stage 1) | |
| Section 4. Impact Prediction (stage 2) | |
| Section 5. Impact Validation (construction) Stage 3 | |
| Section 6. Impact Validation (operation) Stage 4 | |
| Section 7. Reporting and Auditing | |
| Section 8. Roles and Responsibilities | |
| Section 9. References | |
| App A. Alkimos Ministerial Statement 755 | |
| App B. Interpretation of Conditions under Ministerial Statement 755 | |
| App C. Water Corporation Environment Policy | |
| App D. Water Corporation Sustainability Principles | |
| App. E Interim Water Quality Characterisation Data Report | |
| App F. Benthic Habitat Mapping and Infauna Survey | |
| App G (a) Marine Studies Program Sediment Survey | |
| Appendix G (b) Sediment Survey Appendices | |
| App H. Hydrodynamic and Sediment Transport Modelling of Dredge Plume | |
| App I. Australian National Guidelines for Whale and Dolphin Watching 2005 | |
| App J. Roles and Responsibilities | |
| App K. Trigger Evaluation Methodology | |
| App L. Reviewers Reports and Explanation of Amendments in Response | |
| EPA Management Plans Approval | |
| Marine Management Plan Transmittal | |
| Schedule June 05 2008 | |
| Alkimos sea dumping correspondence | |