Alkimos Ocean Outlet Management Plan

The Management Plan for Construction and Ongoing Presence of the Ocean Outlet Pipeline, provides details on the predicted environmental impacts, monitoring program and management procedures to be implemented during construction of the Alkimos ocean outlet. It also outlines how these measures and monitoring program will be implemented by the Alkimos Water Alliance.

The Management Plan for Construction and Ongoing Presence of the Ocean Outlet Pipeline has been prepared to satisfy Condition 8-1 and Condition 9-1 as specified in Ministerial Statement 755 (November, 2007).

 Management Plan Cover and Table of Contents
  
 Section 1. Introduction
  
 Section 2. Scope and Framework
  
 Section 3. Data Acquisition (stage 1)
  
 Section 4. Impact Prediction (stage 2)
  
 Section 5. Impact Validation (construction) Stage 3
  
 Section 6. Impact Validation (operation) Stage 4
  
 Section 7. Reporting and Auditing
  
 Section 8. Roles and Responsibilities
  
 Section 9. References
  
 App A. Alkimos Ministerial Statement 755
  
 App B. Interpretation of Conditions under Ministerial Statement 755
  
 App C. Water Corporation Environment Policy
  
 App D. Water Corporation Sustainability Principles
  
 App. E Interim Water Quality Characterisation Data Report
  
 App F. Benthic Habitat Mapping and Infauna Survey
  
 App G (a) Marine Studies Program Sediment Survey
  
 Appendix G (b) Sediment Survey Appendices
  
 App H. Hydrodynamic and Sediment Transport Modelling of Dredge Plume
  
 App I. Australian National Guidelines for Whale and Dolphin Watching 2005
  
 App J. Roles and Responsibilities
  
 App K. Trigger Evaluation Methodology
  
 App L. Reviewers Reports and Explanation of Amendments in Response
  
 EPA Management Plans Approval
  
 Marine Management Plan Transmittal
  
 Schedule June 05 2008
  
 Alkimos sea dumping correspondence