The Terrestrial Construction Management Plan has been prepared by the Alkimos Water Alliance for construction works associated with the Alkimos Wastewater Scheme. It details how the Alliance will manage the environmental aspects associated with the construction of the Scheme, primarily potential impacts to flora, vegetation and landforms. The primary objective of the Terrestrial Construction Management Plan is:
To protect native vegetation and landforms on the site outside the authorised area of permanent disturbance as defined in Figure 3 in Schedule 2 and Figure 4 in Schedule 3 of Ministerial Statement 755.
The Plan has been prepared to satisfy Condition 6- 2 as specified in Ministerial Statement 755 (November, 2007).
| Executive Summary | |
| Introduction | |
| Exisiting Environment | |
| Management Objectives and Standards | |
| Project Terrestrial Management Principles | |
| Access Roads | |
| Site Offices, Workshop and Amenities | |
| Haul Roads | |
| Quinns Main Sewer | |
| Wastewater Treatent Plant - Site Excavation | |
| Land Connection from the Wastewater Treatment Plant to the Launch Site | |
| Launch Site | |
| Launch Site Dune Crossing and Beach Acccess | |
| Operational Monitoring | |
| Reporting | |
| Summary | |
| References | |
| Images of the works sites | |
| Fig. 1 Wastewater Treatment Plant Locality Plan | |
| Fig. 2 Wastewater Treatment Plant Launch Site Footprint | |
| Fig. 3 Overall Site Works Plan | |
| Fig. 4 Alkimos Landforms and Geoheritage Features | |
| Fig. 5 Vegetation Units | |
| Fig. 6 Vegetation Units of Haul and Access Roads | |
| Fig. 7 Vegetation Condition of Wastewater Treatment Plant | |
| Fig. 8 Vegetation Conditions of Haul and Access Roads | |
| Fig. 9 Vegetation Units of Launch Site and Surrounding Areas | |
| Fig. 10 Vegetation Condition of Launch Site and Surrounding Areas | |
| Fig. 11 Fencing Plan | |
| Fig. 12 Access Road and Haul Road Extent of Disturbance | |
| Fig. 13 Wastewater Treatment Plant Footprint and Extent of Disturbance | |
| Fig. 14 Launch Site Footprint and and Extent of Disturbance | |
| Fig. 15 Proposed Launch Site Footprint, Groyne and Coffer Dam Structures | |
| Fig. 16 Launch Site Longitudinal Section | |
| Fig. 17 Launch Site Cross Sections | |
| App. A Ministerial Statement 755 | |
| App. B Clearing Permit | |
| App. C Department of Environment and Heritage Statement 2007/3259 | |
| App. D Roles and Responsibilities | |
| App. E Ground Disturbing Works Permit | |
| App. G Contact Details for Site Based Staff | |
| App. H Vehicle Hygiene Declaratin Form | |
| App. I Dieback Management Plan | |
| App. I Dieback Management Plan Fig. 1 | |
| App. I Dieback Management Plan Fig. 2 | |
| App. I Dieback Management Plan App. B | |
| App. J Licence to Take Water | |
| App. K Vegetation Community Index | |