Alkimos Terrestrial Construction Management Plan

The Terrestrial Construction Management Plan has been prepared by the Alkimos Water Alliance for construction works associated with the Alkimos Wastewater Scheme.  It details how the Alliance will manage the environmental aspects associated with the construction of the Scheme, primarily potential impacts to flora, vegetation and landforms. The primary objective of the Terrestrial Construction Management Plan is:

To protect native vegetation and landforms on the site outside the authorised area of permanent disturbance as defined in Figure 3 in Schedule 2 and Figure 4 in Schedule 3 of Ministerial Statement 755.

The Plan has been prepared to satisfy Condition 6- 2 as specified in Ministerial Statement 755 (November, 2007). 

Sections of the Alkimos Terrestrial Construction Management Plan

 Executive Summary
  
 Introduction
  
 Exisiting Environment
  
 Management Objectives and Standards
  
 Project Terrestrial Management Principles
  
 Access Roads
  
 Site Offices, Workshop and Amenities
  
 Haul Roads
  
 Quinns Main Sewer
  
 Wastewater Treatent Plant - Site Excavation
  
 Land Connection from the Wastewater Treatment Plant to the Launch Site
  
 Launch Site
  
 Launch Site Dune Crossing and Beach Acccess
  
 Operational Monitoring
  
 Reporting
  
 Summary
  
 References
  
 Images of the works sites
  
 Fig. 1 Wastewater Treatment Plant Locality Plan
  
 Fig. 2 Wastewater Treatment Plant Launch Site Footprint
  
 Fig. 3 Overall Site Works Plan
  
 Fig. 4 Alkimos Landforms and Geoheritage Features
  
 Fig. 5 Vegetation Units
  
 Fig. 6 Vegetation Units of Haul and Access Roads
  
 Fig. 7 Vegetation Condition of Wastewater Treatment Plant
  
 Fig. 8 Vegetation Conditions of Haul and Access Roads
  
 Fig. 9 Vegetation Units of Launch Site and Surrounding Areas
  
 Fig. 10 Vegetation Condition of Launch Site and Surrounding Areas
  
 Fig. 11 Fencing Plan
  
 Fig. 12 Access Road and Haul Road Extent of Disturbance
  
 Fig. 13 Wastewater Treatment Plant Footprint and Extent of Disturbance
  
 Fig. 14 Launch Site Footprint and and Extent of Disturbance
  
 Fig. 15 Proposed Launch Site Footprint, Groyne and Coffer Dam Structures
  
 Fig. 16 Launch Site Longitudinal Section
  
 Fig. 17 Launch Site Cross Sections
  
 App. A Ministerial Statement 755
  
 App. B Clearing Permit
  
 App. C Department of Environment and Heritage Statement 2007/3259
  
 App. D Roles and Responsibilities
  
 App. E Ground Disturbing Works Permit
  
 App. G Contact Details for Site Based Staff
  
 App. H Vehicle Hygiene Declaratin Form
  
 App. I Dieback Management Plan
  
 App. I Dieback Management Plan Fig. 1
  
 App. I Dieback Management Plan Fig. 2
  
 App. I Dieback Management Plan App. B
  
 App. J Licence to Take Water
  
 App. K Vegetation Community Index