Alkimos Wastewater Treatment Plant Odour Management Plan
The Odour Management Plan for the Alkimos Wastewater Treatment Plant aims to ensure that the plant is designed, constructed and operated to manage the potential impacts of odour to within the 600 metre buffer zone, allocated by the Metropolitan Regional Planning Scheme. The plan has been prepared to satisfy Condition 12-1 as specified in Ministerial Statement 755 (November, 2007).
A draft Alkimos Wastewater Treatment Plant Operations Manual can be made available upon request.