Water Corporation maintain templates for a variety of equipment inspection and test reports and procedures.

These are intended to be used by contractors as a base-line guide for:

  • Demonstrating the minimum evidence of compliance with our required design standards, construction quality and operational safety requirements, and
  • Provision of asset characteristics and performance details on new equipment to the Water Corporation for the purposes of registration of the new asset data in our asset management, operations and financial systems.

The templates should be used as a guide to the minimum inspection, testing and asset information required to be delivered for asset handover.

If the contractor wishes to use their own ITRs and ITPs, they must at minimum include the criteria described in the templates for the relevant assets. In this case the ITRs / ITPs will need to be submitted to the Water Corporation for approval before use.

Note. The list of ITRs and ITPs does not cover all possible asset types. Where no ITR / ITP is listed but the contract requires one to be delivered the contractor will need to submit the proposed  ITRs / ITPs for approval by the Water Corporation before use.

The templates should be used in conjunction with the Contract Specifications, Water Corporation Design Standards, Strategic Product Specifications and the Water Services Association of Australia (WSAA) Codes.

Disclaimer

Please read the following disclaimer before referencing these documents.

Any person or entity which relies upon the Template Inspection and Test Reports & Procedures from the Water Corporation website does so entirely at their own risk and without any right of recourse to the Water Corporation, including, but not limited to, using the Template Inspection and Test Reports & Procedures for works other than for or on behalf of the Water Corporation. The Template Inspection and Test Reports & Procedures available from the Water Corporation website are intended solely for information only and cannot be relied upon. The Water Corporation accepts no liability for any loss or damage that arises from anything in the Template Inspection and Test Reports & Procedures including (but not limited to) any loss or damage that may arise due to the errors and omissions of any person.

The Water Corporation shall not be responsible, nor liable, to any person or entity for any loss or damage suffered as a consequence of reliance on, or the unlawful use of, or reference to, the Template Inspection and Test Reports & Procedures, including but not limited to the use of any part of the Template Inspection and Test Reports & Procedures without first obtaining prior express written permission from the CEO of the Water Corporation.

Any interpretation of anything in the Template Inspection and Test Reports & Procedures that deviates from specific Water Corporation Project requirements must be referred to the Water Corporation’s project manager and/or commissioning specialist / manager for that particular Project for further direction or agreement.

Inspection, test reports and procedures

You can find the template you are after by using the categories below. Alternatively you can download a zip file containing all the templates below.

Download all inspection, test reports and procedures

Mechanical - Pump (Bore)  - Construction Verification - Inspection and Test Report (DOC 290KB)

Mechanical - Pump (Bore) - Pre-Commissioning - Inspection and Test Report (DOC 382KB)

Mechanical - Pump (Bore) - Supply Verification - Inspection and Test Report (DOC 289KB)

Mechanical - Pump (Dosing)  - Construction Verification - Inspection and Test Report (DOC 131KB)

Mechanical - Pump (Dosing) - Pre-Commissioning - Inspection and Test Report (DOC 393KB)

Mechanical - Pump (Dosing) - Supply Verification - Inspection and Test Report (DOC 214KB)

Mechanical - Pump (Centrifugal)  - Construction Verification - Inspection and Test Report (DOC 228KB)

Mechanical - Pump (Centrifugal) - Pre-Commissioning - Inspection and Test Report (DOC 400KB)

Mechanical - Pump (Centrifugal) - Supply Verification - Inspection and Test Report (DOC 263KB)

Mechanical - Pump (Positive Displacement) - Supply Verification - Inspection and Test Report (DOC 316KB)

Mechanical - Pump (Submersible)  - Construction Verification - Inspection and Test Report (DOC 222KB)

Mechanical - Pump (Submersible) - Pre-Commissioning - Inspection and Test Report (DOC 369KB)

Mechanical - Pump (Submersible) - Supply Verification - Inspection and Test Report (DOC 254KB)

Mechanical - Pump (Sump)  - Construction Verification - Inspection and Test Report (DOC 211KB)

Mechanical - Pump (Sump) - Pre-Commissioning - Inspection and Test Report (DOC 170KB)

Mechanical - Pump (Sump) - Supply Verification - Inspection and Test Report (DOC 264KB)

Electrical - Flow Switch - Construction Verification - Inspection and Test Report (DOC 107KB)

Electrical - Flow Switch - Pre-Commissioning - Inspection and Test Report (DOC 116KB)

Electrical - Flow Switch - Supply Verification - Inspection and Test Report (DOC 105KB)

Electrical - HV Circuit Breaker - Construction Verification - Inspection and Test Report (DOC 123KB)

Electrical - HV Circuit Breaker - Supply Verification - Inspection and Test Report (DOC 93KB)

Electrical - HV Fuse Switch - Construction Verification - Inspection and Test Report (DOC 123KB)

Electrical - HV Fuse Switch - Supply Verification - Inspection and Test Report (DOC 92KB)

Electrical - HV  Switch - Construction Verification - Inspection and Test Report (DOC 123KB)

Electrical - Instrumentation Switchboard - Construction Verification - Inspection and Test Report (DOC 110KB)

Electrical - Instrumentation Switchboard - Pre-Commissioning - Inspection and Test Report (DOC 91KB)

Electrical - Instrumentation Switchboard - Supply Verification - Inspection and Test Report (DOC 108KB)

Electrical - Pressure Switch - Construction Verification - Inspection and Test Report (DOC 107KB)

Electrical - Pressure Switch - Pre-Commissioning - Inspection and Test Report (DOC 125KB)

Electrical - Pressure Switch - Supply Verification - Inspection and Test Report (DOC 126KB)

Electrical - SCADA Switchboard - Construction Verification - Inspection and Test Report (DOC 101KB)

Electrical - SCADA Switchboard - Pre-Commissioning - Inspection and Test Report (DOC 92KB)

Electrical - SCADA Switchboard - Supply Verification - Inspection and Test Report (DOC 99KB)

Electrical - HV Switchboard - Construction Verification - Inspection and Test Report (DOC 104KB)

Electrical - HV Switchboard - Pre-Commissioning - Inspection and Test Report (DOC 118KB)

Electrical - HV Switchboard - Supply Verification - Inspection and Test Report (DOC 112KB)

Electrical - LV Switchboard - Construction Verification - Inspection and Test Report (DOC 100KB)

Electrical - LV Switchboard - Pre-Commissioning - Inspection and Test Report (DOC 101KB)

Electrical - LV Switchboard - Supply Verification - Inspection and Test Report (DOC 102KB)

Electrical - Sewage Pump Station Acceptance - Pre-Commissioning - Inspection and Test Report (DOC 102KB)

Electrical - HV Switchroom - Construction Verification (DOC 76KB)

Electrical - HV Switchroom - Construction Verification - Inspection and Test Report (DOC 151KB)

Mechanical - Valve (Air) - Construction Verification - Inspection and Test Report (DOC 137KB)

Mechanical - Valve (Air) - Pre-Commissioning - Inspection and Test Report (DOC 289KB)

Mechanical - Valve (Air) - Supply Verification - Inspection and Test Report (DOC 218KB)

Mechanical - Valve (Butterfly) - Construction Verification - Inspection and Test Report (DOC 180KB)

Mechanical - Valve  (Butterfly) - Pre-Commissioning - Inspection and Test Report (DOC 291KB)

Mechanical - Valve  (Butterfly) - Supply Verification - Inspection and Test Report< (DOC 244KB)

Mechanical - Valve (Duo Check / Non-Return)  - Construction Verification - Inspection and Test Procedure (DOC 177KB)

Mechanical - Valve (Duo Check / Non-Return) - Pre-Commissioning - Inspection and Test Report (DOC 269KB)

Mechanical - Valve (Duo Check / Non-Return) - Supply Verification - Inspection and Test Procedure (DOC 239KB)

Mechanical - Valve (Gate)  - Construction Verification - Inspection and Test Report (DOC 176KB)

Mechanical - Valve (Gate) - Pre-Commissioning - Inspection and Test Report (DOC 320KB)

Mechanical - Valve (Gate) - Supply Verification - Inspection and Test Report (DOC 250KB)

Mechanical - Valve (Check - Nozzle)  - Construction Verification - Inspection and Test Report (DOC 169KB)

Mechanical - Valve (Check - Nozzle) - Pre-Commissioning - Inspection and Test Report (DOC 256KB)

Mechanical - Valve (Check - Nozzle) - Supply Verification - Inspection and Test Report (DOC 234KB)

Mechanical - Penstock  - Construction Verification - Inspection and Test Report (DOC 173KB)

Mechanical - Penstock - Pre-Commissioning - Inspection and Test Report (DOC 293KB)

Mechanical - Penstock - Supply Verification - Inspection and Test Report (DOC 237KB)

Mechanical - Valve (Pressure Relief)  - Construction Verification - Inspection and Test Report (DOC 159KB)

Mechanical - Valve (Pressure Relief) - Supply Verification - Inspection and Test Report (DOC 182KB)

Mechanical - Valve (Reduced Pressure Zone (RPZD))  - Construction Verification - Inspection and Test Report (DOC 177KB)

Mechanical - Valve (Reduced Pressure Zone (RPZD)) - Pre-Commissioning - Inspection and Test Report (DOC 269KB)

Mechanical - Valve (Reduced Pressure Zone (RPZD)) - Supply Verification - Inspection and Test Report (DOC 239KB)

Mechanical - Valve (Globe)  - Construction Verification - Inspection and Test Report (DOC 191KB)

Mechanical - Valve (Globe) - Pre-Commissioning - Inspection and Test Report (DOC 286KB)

Mechanical - Valve (Globe) - Supply Verification - Inspection and Test Report (DOC 234KB)

Mechanical - Valve (Sleeve)  - Construction Verification - Inspection and Test Report (DOC 199KB)

Mechanical - Valve (Sleeve / Needle) - Factory Test - Inspection and Test Report (DOC 302KB)

Mechanical - Valve (Sleeve / Needle) - Supply Verification - Inspection and Test Report (DOC 267KB)

Mechanical - Valve (Sleeve / Needle) - Pre-Commissioning - Inspection and Test Report (DOC 303KB)

Mechanical - Valve (Rotary)  - Construction Verification - Inspection and Test Report (DOC 166KB)

Mechanical - Valve (Rotary) - Pre-Commissioning - Inspection and Test Report (DOC 260KB)

Mechanical - Valve (Rotary) - Supply Verification - Inspection and Test Report (DOC 251KB)

Mechanical - Valve (Solenoid)  - Construction Verification - Inspection and Test Report (DOC 152KB)

Mechanical - Valve (Solenoid) - Supply Verification - Inspection and Test Report (DOC 154KB)

Mechanical - Valve (Pressure Relief)  - Construction Verification - Inspection and Test Report (DOC 162KB)

Mechanical - Valve (Pressure Relief) - Pre-Commissioning - Inspection and Test Report (DOC 256KB)

Mechanical - Valve (Pressure Relief) - Supply Verification - Inspection and Test Report (DOC 211KB)

Mechanical - Pressure Test  - Valve  - Certificate Template (DOC 98KB)