Champion Lakes and Seville Grove wastewater upgrades

Improvements to wastewater infrastructure in Champion Lakes & Seville Grove.

back to current projects

Project goal:

To upgrade wastewater infrastructure and services in City of Armadale.

Status:

In construction

Delivery Date:

March 2020

What's happening?

Our authorised contractor, DM Civil, will soon start work to improve our wastewater services in Champion Lakes & Seville Grove. The work includes installation of approximately 1.26 kilometres wastewater pipeline along McNeill Road, Fallon Place and Ticklie Road, as well as upgrading the McNeill Road wastewater pump station to connect to the existing wastewater pipeline on Seville Drive.

Please refer to map below of the work area.

McNeill Rd map of work area

When is this happening?

Work is starting in November 2019 and is estimated to be completed by the end of April 2020.The majority of work will be completed Monday to Friday between 7am and 5pm as approved by your local council.

How will this impact the community?

Noise will be kept to a minimum, however, construction will involve road cutting, excavating and compacting. These activities are most noticeable at the start and finish of our work, when we cut and excavate, and then when we backfill and compact to reinstate affected areas. Please be assured that any affected areas will be reinstated as close as possible to their condition prior to the work. If any trees, shrubs, or lawn needs to be removed, they will be replaced and the area restored.

At times traffic management will be in place, as required, to direct vehicles, pedestrians and cyclists safely around the work area.

 

Upcoming road closures March and April2020

The following road closures have been completed or are in progress:

  1. Single lane closure – between Isaba Parkway and Ticklie Rd, completed
  2. Full road closure – ~350m section of McNeill Road, off Lake Rd (access via Ranford Road). In progress until approximately Monday, 16 March 2020.

Due to unfavourable ground conditions, work has progressed slower than expected on McNeill Road which has resulted in changes to subsequent road closures. Please see below for the latest expected closure periods.

  1. Full road closure – both intersections of Hesketh Avenue and Fallon Place (local traffic only).
    Intersection of Hesketh Avenue expected to reopen on Monday, 16 March 2020.
    Intersection of Fallon Place expected to reopen on Monday, 6 April 2020.
  1. Staged single lane closure – Lake Road, between McNeill Road and Fallon Place.
    From Monday, 16 March 2020 for a period of up to two weeks.

  2. Full road closure – intersection of Eriskay Street and Fallon Place.
    From Monday, 23 March 2020 for a period of up to three weeks.

Please note that these timings are an estimate and may vary slightly depending on how work progresses.

Champion Lakes and Seville Grove - Road Closure Map 

How will this impact you?

Traffic Management

In addition to the daily traffic management around the construction site, the road and lane closures may add additional time to your journey. We encourage drivers to allow for extra travel time or seek an alternative route where possible.

Please remember that the traffic management is in place to ensure drivers and pedestrians are able to travel safely through the area, so please follow the traffic management signs, drive safely and be mindful of increased activity in the area.

We apologise for this inconvenience and will minimise disruption as much as possible.